Plan system acceptance

Agree on testable outcomes before commissioning starts.

Use this planning guide to prepare for an engineering discussion. The final checklist should reflect your specific project and contracted scope.

Set the acceptance boundary

Define the system, interfaces, exclusions, responsible parties, and required operating workflows.

Map requirements to tests

For each requirement, specify the setup, procedure, pass/fail threshold, and evidence to retain.

Confirm test readiness

Check equipment versions, configuration baselines, access, reference instruments, and prerequisites.

Exercise real use and recovery

Test normal workflows and agreed failure or recovery scenarios. Record observed results against the approved criteria.

Close findings and hand over

Assign unresolved issues, retest corrections, record acceptance decisions, and deliver the agreed documentation and training.